Industrial Layout
The bridge is located in the downstream of Sanhu crossing of the Yellow River in Wulateqian Banner, connecting the National Rd 110 and 109. The project began in May, 2008 and was fully opened to traffic on August 1st, 2010. The project was contracted by Inner Mongolia Goldway Bridge and Road Corporation, with a total investment of RMB 290 million. The bridge is 1,847m long and 12m wide, connecting a length of 12.9km.
The Elion Yellow River Bridge opened an important energy channel in the middle and western part of Inner Mongolia, greatly contributing to the economic development of Baotou, Erdos and Hohhot.